31
ABB
4.3 ABB Central Inverters
Termination
Addressing
Interface
No
Yes
LAN
Select “ABB: PVS Central” during the inverter detection.
Overview
•
Interface not integrated; Retrofit components (with the label "RETA-01").
•
Connected using network cable (patch cable) and Ethernet router or switch.
•
Communication address must be allocated.
•
Installation steps:
•
Allocate communication address.
•
Connect inverters to the Solar-Log™.
•
Connect the inverters to each other.
Allocate communication address
•
Recommendation: Continuous numbering starting with 1; address range 1 to 254.
•
Setting: Using the inverter operating display.
•
Procedure: Before connecting to the Ethernet router or switch and allocating the IP address.
Connect inverters and the Solar-Log™.
The wiring is done using a
•
network cable (patch cable) and the
•
Ethernet router or switch.
Procedure
1. Set different unit IDs on each inverter in accordance with the inverter's instructions.
2. Connect the Solar-Log™ and the inverter to the router or switch.
3. Assign an IP address to every inverter. Assign the IP addresses according to the inverter's instructions.
The first three number blocks like the Solar-Log™, e.g.
192.168.178
.49.
The fourth number block: an address that is available, e.g. 192.168.178.50.
Summary of Contents for Solar-Log
Page 1: ...1 Components Connection Manual V 4 2 3 Solar Log EN ...
Page 20: ...20 01 Inverter ...
Page 398: ...398 Appendix 113Appendix 113 1 SMA mixed wiring Fig SMA mixed wiring ...
Page 402: ...402 02 Meter ...
Page 444: ...444 03 Battery Systems ...
Page 456: ...456 sonnen Note Only one battery system can be connected to a Solar Log device ...
Page 463: ...463 04 Heating rods ...
Page 470: ...470 05 Heating pumps ...
Page 478: ...478 06 Sensors ...
Page 488: ...488 07 Pyranometer ...
Page 495: ...495 08 Smart Plug components ...
Page 502: ...502 09 Power Charging Stations ...