316
SolarEdge
87 SolarEdge
87.1 SolarEdge
Termination
Addressing
Interface
Switch
Yes
RS485
Overview
•
Integrated interface
•
Where to connect: Terminal strip inside the inverter
•
Communication address must be allocated
•
3-pin wiring
•
Installation steps
•
Switch off the inverters and Solar-Log™
•
Connect inverters to the Solar-Log™
•
Address inverter and set protocol
•
Connect the inverters to each other
Note
Installing a “SolarEdge-Gateway” on a RS485 bus, connecting SolarEdge inverters with a Solar-Log™,
can lead to communication problems with the inverters. In order to ensure a correct communication
with the Solar-Log™, the “Wireless package” switch must be activated on the respective I/O port in the
web menu.
►
The SolarEdge-Gateway is not supported on I/O port “C”, which has no wireless package option.
Connect inverters to the Solar-Log™
The wiring is done using a
•
self-made cable connection with terminal block connector.
Summary of Contents for Solar-Log
Page 1: ...1 Components Connection Manual V 4 2 3 Solar Log EN ...
Page 20: ...20 01 Inverter ...
Page 398: ...398 Appendix 113Appendix 113 1 SMA mixed wiring Fig SMA mixed wiring ...
Page 402: ...402 02 Meter ...
Page 444: ...444 03 Battery Systems ...
Page 456: ...456 sonnen Note Only one battery system can be connected to a Solar Log device ...
Page 463: ...463 04 Heating rods ...
Page 470: ...470 05 Heating pumps ...
Page 478: ...478 06 Sensors ...
Page 488: ...488 07 Pyranometer ...
Page 495: ...495 08 Smart Plug components ...
Page 502: ...502 09 Power Charging Stations ...