341
Solectria
Connect the inverters to each other
•
Connect with a shielded twisted-pair cable.
•
Where to connect: Terminal strip inside the inverter.
Procedure
1. Open the inverter according to the inverter‘s instructions.
2. Connect the data cable to the terminal block in J1 of inverter 1 (according to the inverter‘s instructions),
connect another data cable to the terminal block J2 of inverter 1 (according to the inverter‘s instructions), then
connect it to inverter 2 via J1 (according to the inverter‘s instructions).
3. Connect the other inverters to each other in the same way.
4. Terminate the last inverter:
Set the jumper to „On“ (refer to the inverter‘s instructions).
Note
A maximum of 16 inverters can be connected per RS485 bus.
The maximum cable length is 1000 meters.
Summary of Contents for Solar-Log
Page 1: ...1 Components Connection Manual V 4 2 3 Solar Log EN ...
Page 20: ...20 01 Inverter ...
Page 398: ...398 Appendix 113Appendix 113 1 SMA mixed wiring Fig SMA mixed wiring ...
Page 402: ...402 02 Meter ...
Page 444: ...444 03 Battery Systems ...
Page 456: ...456 sonnen Note Only one battery system can be connected to a Solar Log device ...
Page 463: ...463 04 Heating rods ...
Page 470: ...470 05 Heating pumps ...
Page 478: ...478 06 Sensors ...
Page 488: ...488 07 Pyranometer ...
Page 495: ...495 08 Smart Plug components ...
Page 502: ...502 09 Power Charging Stations ...