365
Surpass SSE
98
Surpass SSE
98.1
Surpass SSE / SPS-Serie
Termination
Adressing
Interface
-
Yes
RS485
Overview
•
Integrated interface
•
Connection via RS485
•
3-pin wiring
•
The communication address has to be assigned (is set to 1 by default)
•
Installation steps
•
Switch off the inverters and Solar-Log™
•
Connect inverters to the Solar-Log™
•
Connect the inverters to each other
•
Allocate communication address
Connect inverters to the Solar-Log™
The wiring is done using a
•
Self-made cable connection using the RS485 connector and the terminal block connector.
Procedure
1. If you are making the cable yourself, connect the wires as shown in the following diagram::
Solar-Log™ terminal strip connector
RS485 connector
Terminal
Pin
►
1
►
2 (RS485+)
►
3
►
4 GND
►
4
►
3 (RS485-)
2. RS485 connector an den Wechselrichter, gemäß Anleitung zum Wechselrichter, anschliessen
3. Klemmleistenstecker in RS485-Buchse des Solar-Log™ stecken
Connect the inverters together
•
Start according to the inverter‘s instructions.
Assign the communication address
•
Start according to the inverter‘s instructions.
Summary of Contents for Solar-Log
Page 1: ...1 Components Connection Manual V 4 2 3 Solar Log EN ...
Page 20: ...20 01 Inverter ...
Page 398: ...398 Appendix 113Appendix 113 1 SMA mixed wiring Fig SMA mixed wiring ...
Page 402: ...402 02 Meter ...
Page 444: ...444 03 Battery Systems ...
Page 456: ...456 sonnen Note Only one battery system can be connected to a Solar Log device ...
Page 463: ...463 04 Heating rods ...
Page 470: ...470 05 Heating pumps ...
Page 478: ...478 06 Sensors ...
Page 488: ...488 07 Pyranometer ...
Page 495: ...495 08 Smart Plug components ...
Page 502: ...502 09 Power Charging Stations ...