395
Zeversolar
Procedure
1. If you are making the cable yourself, connect the wires as shown in the following diagram:
Solar-Log™ terminal strip connector
RJ45 inverter
Terminal
PIN
►
1
►
Pin 3
►
4
►
Pin 6
►
5
►
Pin 1
►
6
►
Pin 2
2. Insert the RJ45 plug into any RJ45 socket on inverter 1.
3. If no further inverter is connected, terminate the inverter according to the instructions for the inverter.
4. Insert the terminal block connector into the Solar-Log™ RS485/422 B socket.
Connect the inverters to each other
•
Connect using a network cable (patch cable)
•
Where to connect: RJ45 socket on the outside of the inverter
Procedure
1. Insert the RJ45 plug into any RJ45 socket on inverter 1.
2. Insert the other end of the wire into any RJ45 socket on inverter 2.
3. Connect the other inverters to each other in the same way.
4. Terminate the last inverter according to the inverter instructions.
Note
All Zeverlution S, Zeverlution 3680/4000/5000 and Evershine TLC inverter models can be supplied as
an additional option with an already integrated monitoring solution (ComBox) from Zeversolar. If one
of these models is purchased with an integrated solution, it is not possible to connect a third-party
monitoring system. Therefore there is no compatibility to Solar-Log™.
Summary of Contents for Solar-Log
Page 1: ...1 Components Connection Manual V 4 2 3 Solar Log EN ...
Page 20: ...20 01 Inverter ...
Page 398: ...398 Appendix 113Appendix 113 1 SMA mixed wiring Fig SMA mixed wiring ...
Page 402: ...402 02 Meter ...
Page 444: ...444 03 Battery Systems ...
Page 456: ...456 sonnen Note Only one battery system can be connected to a Solar Log device ...
Page 463: ...463 04 Heating rods ...
Page 470: ...470 05 Heating pumps ...
Page 478: ...478 06 Sensors ...
Page 488: ...488 07 Pyranometer ...
Page 495: ...495 08 Smart Plug components ...
Page 502: ...502 09 Power Charging Stations ...