423
Inepro
5.2
Inepro 75D
Selections available under Inepro / DMM
Overview
•
The communication address cannot be freely assigned.
•
2-pin wiring.
•
Installation steps:
•
Switch off the meter and the Solar-Log™.
•
Connect the meter to the Solar-Log™.
Connect the meter to the Solar-Log™.
The wiring is done using a
•
self-made cable connection with a terminal block connector.
Cable connection via RS485:
Solar-Log™ RS485 terminal block
Solar-Log 50
Inepro 75D
Pin assignment
Pin assignment
1
1 or 5
8 - RS485A
4
4 or 6
7 - RS485B
Possible meter operating modes for the Inepro 75D meter via RS485:
•
Total plant metert
•
Sub-consumption meter
•
Consumption meter
•
Generator
Cable connection via S0:
Solar-Log™ S
0
terminal block
Inepro 75D
Pin assignment
Pin assignment
1 - S0+
6 - S0+
2 - S0-
5 - S0-
3
4
Place a cable bridge between pin 3 and 4 on the Solar-Log™.
Possible meter operating modes for the Inepro 75D meter via S0:
•
Total plant meter
•
Sub-consumption meter
•
Consumption meter
•
Generator
Impulse factor of the meter:
1600 p / kWh
Summary of Contents for Solar-Log
Page 1: ...1 Components Connection Manual V 4 2 3 Solar Log EN ...
Page 20: ...20 01 Inverter ...
Page 398: ...398 Appendix 113Appendix 113 1 SMA mixed wiring Fig SMA mixed wiring ...
Page 402: ...402 02 Meter ...
Page 444: ...444 03 Battery Systems ...
Page 456: ...456 sonnen Note Only one battery system can be connected to a Solar Log device ...
Page 463: ...463 04 Heating rods ...
Page 470: ...470 05 Heating pumps ...
Page 478: ...478 06 Sensors ...
Page 488: ...488 07 Pyranometer ...
Page 495: ...495 08 Smart Plug components ...
Page 502: ...502 09 Power Charging Stations ...