Battery charging time shift function:
If the plant is required to implement fixed percentage (x %) reductions (EEG/subsidy), the Solar-Log™ can shift
the charging time for the battery to peak power production periods so that the total production does not have
to be reduced. In addition to weather forecast data, the Solar-Log™ also factors in the plant consumption data
into battery charging management. This means that the Solar-Log™ has saved the typical past consumption data
and checks this data to see if the battery has been charged 100%. The charging times are adjusted accordingly as
needed.
Summary of Contents for Solar-Log
Page 1: ...1 Components Connection Manual V 4 2 3 Solar Log EN ...
Page 20: ...20 01 Inverter ...
Page 398: ...398 Appendix 113Appendix 113 1 SMA mixed wiring Fig SMA mixed wiring ...
Page 402: ...402 02 Meter ...
Page 444: ...444 03 Battery Systems ...
Page 456: ...456 sonnen Note Only one battery system can be connected to a Solar Log device ...
Page 463: ...463 04 Heating rods ...
Page 470: ...470 05 Heating pumps ...
Page 478: ...478 06 Sensors ...
Page 488: ...488 07 Pyranometer ...
Page 495: ...495 08 Smart Plug components ...
Page 502: ...502 09 Power Charging Stations ...