359
Suntigua
95
Suntigua
95.1
Suntigua
Termination
Addressing
Interface
DIP switch
Yes
RS485
Overview
•
Integrated interface
•
Where to connect: Terminal strip inside the inverter
•
2-pin wiring
•
Communication address must be allocated.
•
Installation steps
•
Switch off the inverters and Solar-Log™
•
Connect inverters to the Solar-Log™
•
Connect the inverters to each other
•
Allocate communication address
Connect inverters to the Solar-Log™
The wiring is done using a
•
self-made, shielded 2 wire data cable with a terminal block connector.
Procedure
1. Open the inverter as shown in the inverter's instructions.
2. If you are making the cable yourself, connect the wires as shown in the following diagram:
Solar-Log™ terminal strip connector
Terminal strip inside the inverter
Terminal
RS485 terminal
►
1 A/Data+
►
1 T/R 1+
►
4 B/Data-
►
2 T/R 1-
3. If no further inverter connected, terminate the inverter:
In the inverter, set the DIP switch for the terminal resistor to ON.
4. Close inverters.
5. Insert the terminal block connector into the Solar-Log™ RS485 socket.
Connect the inverters to each other
•
Where to connect: Terminal strip inside the inverter
•
2-pin wiring
Summary of Contents for Solar-Log
Page 1: ...1 Components Connection Manual V 4 2 3 Solar Log EN ...
Page 20: ...20 01 Inverter ...
Page 398: ...398 Appendix 113Appendix 113 1 SMA mixed wiring Fig SMA mixed wiring ...
Page 402: ...402 02 Meter ...
Page 444: ...444 03 Battery Systems ...
Page 456: ...456 sonnen Note Only one battery system can be connected to a Solar Log device ...
Page 463: ...463 04 Heating rods ...
Page 470: ...470 05 Heating pumps ...
Page 478: ...478 06 Sensors ...
Page 488: ...488 07 Pyranometer ...
Page 495: ...495 08 Smart Plug components ...
Page 502: ...502 09 Power Charging Stations ...