UPS for 400 Vac Grid, Installation Guide, doc. rel. 3.0
3
Figure 3: Remove the roof and support beam (use electric screwdriver)
7.
Remove the screws that are holding the walls and support beams of the crate in place.
Then carefully remove the walls themselves leaving the UPS standing on its wooden
shipping pallet.
Figure 4: Remove the walls of the crate
8.
Cut and remove any straps that are securing the UPS to the shipping pallet.
9.
Remove the plastic wrapping and all other packaging material from the UPS.
Be careful to avoid scratching the finish of the Modular UPS.
10.
Lift the UPS from the shipping pallet and move it to the location where it will be
installed.