UPS for 400 Vac Grid, Installation Guide, doc. rel. 3.0
13
Mechanical Test
2.
One by one, place each power module in a shelf and push it all the way in. Verify that
each module makes a mechanincal connection with the power backplane on the inside
rear of the shelf.
3.
Slide out each Power module by about 7cm, enough to unplug them from the power
backplane, and attach the right and left ribbon cables between the modules and the
base.
Fully slide the bottom module securly into the base.