UPS for 400 Vac Grid, Installation Guide, doc. rel. 3.0
57
To perform the ATS test:
1.
From the System Menu choose
Main > Setup > Dry contacts > Generator mode
setup
.
The Generator screen appears:
Figure 40: Generator mode
2.
From the
Generator
drop down menu choose dry contact 2 and select
Confirm
.
Now that it is enabled the battery charging current will be limited when the contact opens or
closes depending on controller setting configuration.
To change system controller settings from default N.O. (normally open) to N.C.
(normally closed):
1.
From the System Menu navigate to input dry contact settings by choosing
Main >
Setup > Dry contacts > Input dry contacts
.