Chapter 4: Commissioning of the facility
SolarEdge Installation Guide - MAN-01-00060-2.6
24
Chapter 4: Commissioning of the facility
The next chapter describes how to activate the system, the commissioning of the installation, and verification of system
operation.
Step 1 System activation
1
Make sure the on / off switch on the inverter is off. Turn the breaker CA.
1
Make sure the on / off switch on the inverter is off. Turn the breaker CA.
WARNING !
RISK OF ELECTRIC SHOCK. Do not touch uninsulated son when the UPS cover is removed.
2
Activate the inverter according to the activation instructions provided in the package of the inverter.
2
Activate the inverter according to the activation instructions provided in the package of the inverter.
3
Check that the inverter is configured for the right country: press the LCD illumination button up
3
Check that the inverter is configured for the right country: press the LCD illumination button up
obtaining the status screen ID:
ID: # # # # # # # # # # DSP 1/2: 1. 0 2 1 0/1. 0 0 5 2 CPU: 0 0 0 2. 0 4 7 1 P ays
FRA
4
If necessary, do the following before closing the lid of the inverter:
4
If necessary, do the following before closing the lid of the inverter:
•
Country settings, or configuration of the inverter user buttons of the internal LCD - see
Chapter 5: User
Country settings, or configuration of the inverter user buttons of the internal LCD - see
Chapter 5: User
Interface
page 29
Interface
page 29
•
Connection of communication options - refer to
Chapter 6: Communication Setup
Connection of communication options - refer to
Chapter 6: Communication Setup
Connection of communication options - refer to
Chapter 6: Communication Setup
5
Attaching the inverter cover and secure by tightening the screw with a torque of
5
Attaching the inverter cover and secure by tightening the screw with a torque of
9.0 N * m / 6.6 ft * lb. For proper sealing, first tighten the screws in the corners, then the two central screws. The following figure
illustrates the recommended order:
Figure 14: screw tightening Order
6
If another external DC switch is installed between the power optimizers and (s)
6
If another external DC switch is installed between the power optimizers and (s)
inverter (s), then turn it on.
A similar status screen the following appears on the LCD panel of the UPS:
V ac [v] V dc [v] P ac [w]
2 4 0, 7
1 4, 1
0, 0
P _ OK: 0 0 0/0 0 0 <S _ OK>
OFF
# 3
# 1
# 1
# 6
# 4
# 5
# 2