background image

15

Safety, Installation, and Operations Manual

©2021 The Solaria Corporation     All rights reserved.   Contents subject to change without notice.     AUS-MAN-0002 Rev 01, 03-2021

Power Unlocked by Design

7.3 Additional Third-Party Grounding Devices

Solaria Solar Modules can be grounded using third party grounding devices so long as they are certified for 

grounding modules and the devices are installed according to the manufacturer’s specified instructions.

8.0 Operation & Maintenance

It is required to perform regular inspection and maintenance of the Modules, especially within warranty scope. 

8.1 Cleaning

The dust accumulated on the front transparent substrate may reduce the power output, and may even cause 

regional hot-spot effect. Industrial effluents or bird droppings may be a serious case, and the extent of the severity 

depends on the transparency of the foreign objects. It’s usually not dangerous for the accumulated dust to reduce 

the sunshine, because the light intensity is still homogeneous and the power reduction usually is not obvious.
When Modules are operational, there may exist environmental factors that cast shade, dust, plants and so on, that 

may distinctly reduce the power output. Solaria advises that there should be no obstructed object over the Module’s 

surface at any time. 
The cleaning frequency depends on the frequency of debris or dust accumulation . In many instances the front 

substrate is cleaned with the rain, and can decrease the cleaning frequency required. It is recommended to wipe the 

glass surface with wet sponge or soft cloth. Please do not clean the glass with cleaning agent which contains acid 

or alkali. 

8.2 The Visual Inspection Of The Modules

Inspect the Modules visually to find if there are appearance defect, the following three types need more attention 

especially:

A. Whether the glass is broken;
B. If there is evidence of burning vestige on the backsheet

8.3 The Inspection Of The Connector & The Cable

It is recommended to implement the following preventive maintenance every 6 months:

A. Check the encapsulation of the connector with the cable.
B. Check the sealing gel of the junction box to ensure it is not cracked or damaged.

Summary of Contents for PowerXT-395R-PM

Page 1: ...ions Manual 2021 The Solaria Corporation All rights reserved Contents subject to change without notice AUS MAN 0002 Rev 01 03 2021 SAFETY INSTALLATION AND OPERATIONS MANUAL Australia PowerXT 400 PM R Module Power Unlocked by Design ...

Page 2: ... documentation is updated frequently Check the Solaria website solaria com australia for the latest information For warranty text refer to solaria com australia docsAU For Solaria patent information refer to solaria com patents 2021 The Solaria Corporation All rights reserved Registered Office Solaria Australia Pty Ltd C o Mertons Corporate Services Pty Ltd Level 7 330 Collins Street Melbourne Vic...

Page 3: ...Condition 7 4 1 Installation position and working environment 7 4 2 Tilt Angle Selection 8 5 Mechanical Installation 8 5 1 Conventional requirements 8 5 2 Installation methods 9 6 Electrical Installation 11 6 1 Electrical Property 11 6 2 Cables and Wiring 12 6 3 Connectors 12 6 4 Bypass Diodes 13 7 Grounding 13 7 1 Grounding by using grounding bolt 13 7 2 Grounding by using unused mounting hole 14...

Page 4: ...tents or other rights of third parties that may result from use of Modules Solaria reserves the right to make changes to the product specifications or installation manual without prior notice Failure to comply with the requirements listed in this manual will invalidate the Solaria Limited Product Warranty Warranty Additional recommendations are provided to enhance safety practices and performance ...

Page 5: ...rmed by a certified building specialist or engineer For your safety do not attempt to work on a rooftop until safety precautions have been identified and taken including without limitation fall protection measures ladders or stairways and personal protective equipment For your safety do not install or handle Modules under adverse conditions including without limitation strong or gusty winds and we...

Page 6: ...to damage Secure pallets from falling over Do not exceed the maximum height of pallets to be stacked as indicated on the pallet packaging Store pallets in a ventilated rain proof and dry location until the Modules are ready to be unpacked Do not lift the Modules by grasping the Module s junction box or electrical leads in any condition Do not stand or step on the Modules Do not drop the Modules on...

Page 7: ...ules Modules must be mounted on appropriate mounting structures positioned on suitable buildings the ground or other structures suitable for modules e g carports building facades or PV trackers Modules must not be installed in locations where they could be submerged in water The recommended ambient temperature should be within 40 C 40 F to 40 C 104 F The temperature limits are defined as the month...

Page 8: ...be securely attached to the mounting structure In regions with heavy snowfall select the height of the mounting system so that the lowest edge of the Modules is not covered by snow for any length of time In addition ensure that the lowest portion of the Modules is placed high enough so that it is not shaded by plants or trees or damaged by flying sand When the Modules are supported parallel to the...

Page 9: ...unting holes located in the frame s back flanges Refer to what is shown in Figure 2 Mounting Details For your reference please use the components specified below 5 Front side test load 2400Pa backside test load 2400Pa and both safety factor is 1 5 6 Recommended torque is between 14N m to 20N m 5 2 2 Modules Installed With Clamp Modules can be mounted using specialized clamps as shown in Figure 3 A...

Page 10: ...es Avoid shading effects from the Modules clamps Drainage holes on the Module frame must not be closed or obscured by the clamps D Front side test load 2400Pa backside test load 2400Pa and both safety factor is 1 5 Note The module has been qualified following the mechanical load requirements per IEC61215 2016 using 3 cycles with a test load of 2400Pa An additional test cycle of 5400Pa Front 4th cy...

Page 11: ...ed by a factor of 1 25 when determining component voltage ratings conductor capacities fusing sizes and size of controls connected to the Module output Voltages are additive when Modules are connected directly in series and Modules currents are additive when Modules are connected directly in parallel as illustrated in Figure 6 Modules with different electrical characteristics must not be connected...

Page 12: ...n PV systems The minimum wire size should be 4mm2 12AWG Rating Required Minimum Field Wiring Cables should be fixed to the mounting structure in such a way that mechanical damage of the cable and or the Modules is avoided Do not apply stress to the cables The minimum cables bending radius should be 38 4mm Any cable damage caused by bending too much or cable management system is not covered under S...

Page 13: ...lloy and penetrate the surface of the frame oxidation film Please don t drill any additional grounding hole on the frame of the Modules otherwise it will expressly void the Solaria warranty For optimal performance Solaria Solar Modules should only be used in configurations where the DC cathode of the Modules array is connected to ground Failure to comply with this requirement will reduce the perfo...

Page 14: ...the mounting holes in the frame Thread the grounding clamp and the frame with grounding bolt B Put the toothed gasket into the other side then tighten and lock the nut The recommended torque of locking the nut is 2 0 N M 2 2 N M C Thread the grounding clamp with grounding wire The materiel and size of grounding wire should meet the relevant requirements of the national regional and local code law ...

Page 15: ...l homogeneous and the power reduction usually is not obvious When Modules are operational there may exist environmental factors that cast shade dust plants and so on that may distinctly reduce the power output Solaria advises that there should be no obstructed object over the Module s surface at any time The cleaning frequency depends on the frequency of debris or dust accumulation In many instanc...

Page 16: ...trical specifications or additional information The datasheet is available at www solaria com A Performance at STC Module type Pmp W Voc V Vmp V Isc A Imp A PowerXT 395R PM 395 51 45 42 78 9 95 9 23 PowerXT 400R PM 400 51 68 43 08 9 97 9 28 PowerXT 405R PM 405 51 91 43 51 9 98 9 32 PowerXT 410R PM 410 52 04 43 63 10 00 9 41 PowerXT 415R PM 415 52 14 43 93 10 10 9 45 Remark 1 Maximum overcurrent pr...

Page 17: ... Installation and Operations Manual 2021 The Solaria Corporation All rights reserved Contents subject to change without notice AUS MAN 0002 Rev 01 03 2021 Power Unlocked by Design B Bypass Diode For Junction Box ...

Page 18: ...18 Safety Installation and Operations Manual 2021 The Solaria Corporation All rights reserved Contents subject to change without notice AUS MAN 0002 Rev 01 03 2021 Power Unlocked by Design ...

Page 19: ...Contents subject to change without notice AUS MAN 0002 Rev 01 03 2021 Power Unlocked by Design Solaria Australia Pty Ltd C o Mertons Corporate Services Pty Ltd Level 7 330 Collins Street Melbourne Victoria 3000 Australia Australia Contact Bob Blakiston T 61 417 948 319 www solaria com australia ...

Reviews: