tin plating on the lug. Insert a #10 flat washer between the grounding lug and the module frame. A #10 

tooth lock washer must be inserted between the nut and the module frame to break the anodized layer of 

the frame. This mechanical bond between the tooth lock washer and the frame of the module will ensure a 

good electrical bonding path.

 

Š

The #10-32 assembly attachment screw must be tightened between 20-25 inch-pound. A 10 AWG bare 

copper ground conductor must be attached to the ground lug using the stainless-steel set screw provided 

by the lug manufacturer. Tighten the set screw between 10-15 inch-pound to ensure a strong mechanical 

and electrical bond.

 

Š

Recommended stainless steel hardware and assembly:

                         

Grounding Hole A

#10-32 Hex Headed Screw SS

#10-32 Hex Nut SS

#10 Tooth Lock Washer SS

#10 Flat Washer SS

3.2 Non Grid-Tied Applications

 

y

Contact Solaria for appropriate grounding guidelines.

4.0 Module Mounting

The Solaria Limited Product Warranty is contingent upon modules being mounted in accordance to the 

requirements described in this section.

4.1 Site Considerations

Solaria modules should be mounted in locations that meet the following requirements.

 

y

Module should not be mounted in locations where it will be in direct contact with salt water.

 

y

When choosing a site, avoid obstructions that could cast shadows on the modules as much as possible.

4.2 Mechanical Installation

Solaria module mounting configurations must meet the following requirements:

 

y

Do not remove or alter the module frame. Creating additional mounting holes may damage the module and 

reduce the strength of the frame.

 

y

For roof mounting, the modules should be mounted over a fire-resistant covering rated for the application.

 

y

Clearance of 7 mm or more between modules is required to allow for thermal expansion of the frames.

 

y

Clearance of 100 mm or more is recommended between the modules and the rooftop or nearest surface.

 

y

Always keep the back surface of the module free from any foreign objects or structural elements which could 

Summary of Contents for PowerXT R-BD Series

Page 1: ...ions Manual Solaria Corporation All rights reserved Contents subject to change without notice SOL MAN 0002 Rev 09 12 2020 SAFETY INSTALLATION AND OPERATIONS MANUAL United States and Canada PowerXT R M...

Page 2: ...94538 USA solaria com contact Other Information Product information is subject to change without notice All trademarks are recognized as the property of their respective owners User documentation is...

Page 3: ...o change without notice SOL MAN 0002 Rev 09 12 2020 Power Unlocked by Design Table of Contents 1 0 Introduction 4 2 0 Safety Precautions 4 3 0 Electrical Installation 5 4 0 Module Mounting 7 5 0 Maint...

Page 4: ...time y Do not artificially expose additional high intensity sunlight directly on the module y Do not disconnect modules while under load y All installations must be performed in compliance with local...

Page 5: ...cting cables be double insulated flexible copper Cu conductors with a minimum rating of 90 C The cable size should be determined by the applicable codes but is recommended that this be no less than 4m...

Page 6: ...local authorities to determine the necessary system hardware grounding requirements y Module frames should be electrically connected to an earth ground for safety and protection from lightning in acco...

Page 7: ...d Tied Applications y Contact Solaria for appropriate grounding guidelines 4 0 Module Mounting The Solaria Limited Product Warranty is contingent upon modules being mounted in accordance to the requir...

Page 8: ...ts of the National Electrical Code ANSI NFPA 70 2014 2017 y Any module without a frame laminate shall not be considered to comply with the requirements of IEC UL 61730 unless the module is mounted wit...

Page 9: ...V module mountings are available and compatible with PowerXT In the absence of manufacturer s recommendations for clamp size Solaria recommends minimum clamp size of 40mm 1 57 Maximum Allowed Loading...

Page 10: ...AREA A CLAMP AREA B Front Load 5400Pa 2400Pa Rear Load 3600Pa 2400Pa 4 0in 101 6mm CLAMP AREA A 6 0in 152 4mm CLAMP AREA A 12 4in 315 7mm 11 4in 290 0mm 11 0in 279 4mm CLAMP AREA B 11 0in 279 4mm CLAM...

Page 11: ...48 inches and maximum cantilever of 17 inches Follow racking system manufacturer s recommendations for coupling clamps at the module corners torques and bonding methods For rail less systems maximum a...

Page 12: ...the module are beyond The Solaria Corporation control The Solaria Corporation does not assume responsibility and expressly disclaims liability for loss damage injury or expense arising out of or in an...

Page 13: ...e without notice SOL MAN 0002 Rev 09 12 2020 Power Unlocked by Design 8 0 Mechanical Dimensions PowerXT xxxR PX PowerXT xxxR BX y Nominal dimensions in millimeters and inches Not Drawn to Scale y 4x 4...

Page 14: ...ject to change without notice SOL MAN 0002 Rev 09 12 2020 Power Unlocked by Design PowerXT xxxR PD PowerXT xxxR BD y Nominal dimensions in millimeters and inches Not Drawn to Scale y 4x 4 5mm 0 18in G...

Page 15: ...PORATION ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF SOLARIA CORPORATION IS PROHIBITED NOTES THE TOLERANCES AND DIMENSIONS ON THIS PAGE ARE FOR THE REFERENCE OF THE INSTAL...

Page 16: ...olaria Corporation All rights reserved Contents subject to change without notice SOL MAN 0002 Rev 09 12 2020 Power Unlocked by Design Solaria USA 45700 Northport Loop East Fremont CA 94538 United Stat...

Reviews: