24
3. Cut back the insulation of the conductor by 19 mm.
4. Connect the wires in the following sequence:
– the protective conductor to the "PE" terminal
– the neutral conductor to the "N" terminal
– the mains phases to the terminals "L1", "L2", and "L3".
– Tightening torque: 4 to 4.5 Nm
L2 L3
PE
4 … 4.5 Nm
M5
N
L1
19 mm
Figure 13 AC connection
5. Check the cable connections for firm seating.
6. Tighten the M40 cable gland.
7. Check the cable strain relief.
8. Connect the second protective conductor (optional):
– Installation sequence (see Figure 14): M5 toothed washer (No. 1), cable shoe (No.
2), M5 washer (No. 3), M5 circlip (No. 4), M5 lock nut (No. 5);
– all fixing elements are included in the delivery.
Summary of Contents for SM30HT4
Page 1: ...Instruction manual SolarMax HT series 30HT4 32HT4...
Page 10: ...10 3 4 Dimensions mm 590 580 397 847 871 Figure 1 Dimensions with wall mounting bracket...
Page 11: ...en 11 3 5 Views of the unit 2 3 4 12 11 9 10 8 7 7 6 1 5 Figure 2 Views of the unit...
Page 74: ...SolarMax Service Center hotline solarmax com www solarmax com service 2014 05 en...