36
– The "Confirmation" menu is then displayed.
6. Check the data in the "Confirmation" menu.
7. To complete initial start-up, press
.
– The main menu will then be displayed (see Section 7.4).
– In the case of commissioning in Italy, after initial start-up the auto test must be
carried out (see Section 6.3).
6�2�3 Country-specific menus
Depending on the country setting, additional menus will be displayed during initial
start-up.
Country: Denmark
Menu
Setting
Description
Plant system rating
> 13.8 kVA – 30 kVA*
The plant system rating is higher than 13.8
kVA and does not exceed 30 kVA.
> 30 kVA
The plant system rating is higher than 30
kVA. External grid monitoring will be used.
CosPhi(Pac) - QMCPP
Inactive
The "cos
φ
(Pac)" function is deactivated
(cos
φ
=1).
On
The "cos
φ
(Pac)" function is activated.
* only available with the SM30HT4
Country: Germany
Menu
Setting
Description
Grid connection
Medium voltage
The inverter is connected to the medi-
um-voltage mains.
Low voltage
The inverter is connected to the low-voltage
mains.
System power*
> 13.8 kVA – 30 kVA**
The plant system rating is higher than 13.8
kVA and does not exceed 30 kVA.
> 30 kVA
The plant system rating is higher than 30
kVA. External grid monitoring will be used.
CosPhi(Pac) - QMCPP*
Inactive
The "cos
φ
(Pac)" function is deactivated
(cos
φ
=1).
On
The "cos
φ
(Pac)" function is activated.
* only available with "Low-voltage" grid connection
** only available with the SM30HT4
Summary of Contents for SM30HT4
Page 1: ...Instruction manual SolarMax HT series 30HT4 32HT4...
Page 10: ...10 3 4 Dimensions mm 590 580 397 847 871 Figure 1 Dimensions with wall mounting bracket...
Page 11: ...en 11 3 5 Views of the unit 2 3 4 12 11 9 10 8 7 7 6 1 5 Figure 2 Views of the unit...
Page 74: ...SolarMax Service Center hotline solarmax com www solarmax com service 2014 05 en...