Connect
the two metal clips into position and attach to
the
surface. It is
recommended that
each clip is positioned approximately
7.8in
from each end of
the
SP-XL
Caution : Ensure correct anchor sleeves are used for surface material.
Please
see package contents before installation.
Insert Tension
Bolt and attach
the
SP- XL
to the metal clips.
Using a screw driver, secure each clip onto the
SP-XL
with
the Tension bolt. Note : This is only to secure the
SP-XL
so
it cannot be removed - Do not over tighten.
.
Connect the MC4 Connectors to the Solar PV panel.
Note : A matching pair of MC4 connectors are included
in the contents of this package. If the Solar PV Panel
does NOT have an identical pair of MC4 connectors,
replace them with the ones provided to guarantee a
weather tight connection
.
Power ON the
SP-XL
A RED signal light can be seen
at the sensor end of the
SP-XL.
Program the light to
best suit your installation.
Please refer to setup guide of manual properly.
Summary of Contents for SP-XL Series
Page 1: ...SP XL Series...