13 |
P a g e
On the Ground
Wall mounting PCE controller
Choose a suitable location, giving consideration to the following:
1.
Vertical wall mount at a height of between 1.5m to 2m above ground level
giving consideration to cable length and path to the Hot water vessel and
PV main array isolator location and diversion requirements.
2.
It is important to mount the controller out of the direct sunlight as it will
make visual reading of the LCD display difficult.
3.
The control box shall be 3 x point screw mounted, via the attached slotted
metal brackets at the top and bottom of the controller e.g.: 2 x screws at
the top 1 x screw at the bottom. Determine preferred affixing mounting
screw method to suit wall substrate. The 2 x top screw holes shall be
80mm apart and the 1 x bottom screw hole shall be 275mm down central
to the top 2 x holes and control box. EG: (Like the capital letter
T
80mm
across top & 275mm down).
Continued..
Figure 4