SOLE S.A. – Solar Collectors – Installation Manual
15
Remove the protection caps
of the collector lateral’
connections and introduce
the two compression union
connectors (see fig. 5).
Remove the protection caps of the connections of the lateral of the second collector
and place it on the structure, on the cross profiles E1 or E2 lower and upper.
Slide the second collector so that the end is introduced into the connector. Verify that
the connection has been done correctly and that the holes in the structure match
those holes back of the collectors. Adjust the position of the collectors if necessary.
Adjust the higher cross- E1 or E2 profile to the collectors and tighten the bolts that
bind to the longitudinal profiles D3.
Screw the solar collectors to the structure, with the bolts M6x20 (four per collector)
with their washers.
Make sure all bolts and the different elements of the structure are properly tightened
and check the solidity of the whole and its correct fixing to the bench. The collectors
and the support system can withstand wind velocity up to 120km/h and weight of
snow up to 80cmheight at 45 degrees.
The bank of two solar collectors is ready to start the hydraulic connections.
Figure 17.