• Set the switch to ON.
When starting the LR-BST-25 connects to the in-
ternet and thus to the MySOLEM platform.
The LEDs will be green for one hour after startup
to signal that the product is operational.
1.2 Reassemble the LR-BST-25
• Adjust the length of the cable by pulling on it.
• Snap the pieces together applying a strong
pressure and then lock them.
• Adjust the cable.
• Tighten the strain relief.
1.1.1 Connecting the battery
• Connect the battery.