27
SOLID AIR ® INTERNATIONAL
•
T +31 598 36 12 21
•
www.solid-air.com
•
contact@solid-air.nl
i
7.1 Preparation for commissioning
>>
Check that the duct system has been correctly installed and is not leaking.
>>
Check that the hydraulic lines to the heat exchanger have been correctly installed and that none are leaking.
>>
Trap fitted and filled with water.
>>
Accessory parts securely fitted.
>>
Electrical accessories are correctly connected.
7.2 Starting the system
>>
Engage the unit isolator.
>>
Wait until the BMK programming unit initialises and changes to the display mode.
>>
Select the required operating mode on the BMK.
The system will start with the preset parameters.
>>
To modify functions and parameters, see the installation and operating instructions provided.
To modify functions and parameters, see the operating instructions provided.
>>
Check the following functions:
•
Check all inputs and outputs for correct wiring and function.
•
Frost protection function.
•
Fan rotational direction.
•
Outdoor air/extract air damper rotational direction.
•
Plausible sensor values (room sensor, supply air sensor, extract air sensor, outdoor air sensor, ice sensor).
•
Check motor currents.
•
Motor protection (thermal cut-outs/thermistors).
•
Air flow monitoring.
•
Filter monitor.
•
Bypass damper function (rotational direction).
•
Actuator, heating/cooling.
•
Heating circuit pump/cooling circuit pump.
•
As well as all other system-specific functions.
The Solid Air warranty will be void if the function test is not carried out correctly.
✔