7.2.1 Starting the fans
>>
Close the doors securely using a tool. Otherwise there is a risk of motor overload.
>>
Carry out air flow rate tests with the doors closed.
>>
Route test hose connections out of the unit (see flow rate calculation).
>>
Changes are made via the BMK programming unit (see relevant operating instructions).
7.2.2 Commission the electric preheating coil (accessories)
>>
The air volume must not be below the minimum level.
•
Minimum air volume:
CPL-1400
=
600 m³/h
CPL-2400
=
1100 m³/h
CPL-3300
=
1500 m³/h
CPL-4700
=
2200 m³/h
CPL-6100
=
2900 m³/h
>>
Follow the relevant safety regulations for electric heating coils.
>>
The electric preheating coil must be protected from moisture and water.
•
The electric preheating coil (filter pre-dryer) is activated by the control unit based on the outside temperature.
7.2.3 Electric reheating coil (accessory)
>>
The electric reheating coil is switched by the temperature controller.
>>
Minimum air volume.
CPL-1400
=
600 m³/h
CPL-2400
=
1100 m³/h
CPL-3300
=
1500 m³/h