7
The wall is composed of concrete blocks (minimum density of 550 kg/m³) or reinforced
concrete (minimum density of 2200 kg/m³) and with a minimum thickness of 100 mm.
Installation material is gypsum plaster or mortar.
INSTALLATION
1. Create an opening in the wall (minimal dimensions on
bracket
(1)
90°. Place the damper in the opening up to the wall limit mark
(7)
on the
damper.
Damper blade must be closed during the installation!
2. Fix the damper to the wall using screws. Bracket screw hole is 6 mm in diameter.
3. Fill the space between the damper and the wall with gypsum plaster or mortar
(2)
.
*Multiple fire dampers can be installed next to each other or ceiling/wall with the
minimal distance of 30 mm between them. See
.
Test the operation of the damper blade!