The wall is composed of 2 x 2 plasterboard boards, 12,5 mm thick, installed on a steel frame
construction. The interior of the wall is filled with mineral wool (≥ 100 kg/m³).
Installation material is gypsum plaster or mortar, covered with GKF cover boards.
The minimum thickness of the wall is 100 mm.
625
625
> 440
625
625
> 440
1
2
3
1
4
2
7
FLEXIBLE WALL
INSTALLATION
(MORTAR SEALING)
INSTALLATION
1. Create an opening in the wall (Ø d + 80 mm) x (Ø d + 80 mm) and build the subframe
according to the drawing, see
. Bend the fixing bracket
(1)
90°. Place the damper
in the opening up to the wall limit mark
(7)
on the damper.
Damper blade must be closed during the installation!
2. Fix the damper to the wall using screws (bracket screw hole is 6 mm in diameter).
3. Fill the space between the damper and the wall with mortar
(2)
. Cover the mortar with GKF
gypsum boards
(4)
(12,5 mm thick), and fix them with self-tapping screws Ø 3,5 x 45 mm.
4. *Multiple fire dampers can be installed next to each other or ceiling/wall with the minimal
distance of 30 mm between them. See
.
Test the operation of the damper blade!
>
>