SOLID AIR ®
CLIMATE SOLUTIONS
•
T +31 598 36 12 21
•
www.solid-air.com
•
mail@solid-air.com
25
- 58
Product overview
Technical data
Ordering key
Installations
Accessories
Replacements
Maintenance and operation
The wall is composed of 2 x 2 plasterboard boards, 12.5 mm thick, installed on a steel frame
construction. The interior of the wall is filled with mineral wool (≥ 100 kg/m³).
The minimum thickness of the wall is 100 mm.
Installation material is mineral wool covered with GKF cover boards.
1
4
3
7
625
625
> 440
625
625
> 440
1
2
3
FLEXIBLE WALL
INSTALLATION
(MINERAL WOOL SEALING)
INSTALLATION
1. Create an opening in the wall (Ø d + 80 mm) x (Ø d + 80 mm) and build the subframe
according to the drawing, see
. Bend the fixing bracket (1) 90°. Place the damper
in the opening up to the wall limit mark (7) on the damper.
Damper blade must be closed during the installation!
2. Fix the damper to the wall using screws (bracket screw hole is 6 mm in diameter).
3. Fill the space between the damper and the wall with mineral wool
(3)
(≥ 100 kg/m³).
Cover the mineral wool with GKF gypsum boards
(4)
(12.5 mm thick), and fix them with
self-tapping screws Ø 3,5 x 45 mm.
*Multiple fire dampers can be installed next to each other or ceiling/wall with the minimal
distance of 30 mm between them. See
.
Test the operation of the damper blade!
>
>