RS485 - RJ12 plug connector

Ethernet - RJ45 plug connector

Mounting location of the communication port

Commissioning and activating the system

1.  Switch the AC circuit breaker ON. 

 

Safety information 

 

High voltage, handle with care.

2.   Use the operating buttons and the LC-display of the inverter to check the correctness of the 

country code, display language and configuration of the communication options (and adapt 
these as necessary). You access the menu via the ENTER button (press and hold ENTER for 5 
seconds and then enter the password 

12312312

).

3. Check the following information on the LC-display: 

 

 

Vac:

 Mains voltage (V).

 

  

Vdc:

 Total string voltage (V) (approx. 1 V for each PowerBox connected in series).

 

 

Pac:

 Power fed into the mains grid (W).

 

 

P-OK:

 Shows the number of connected PowerOptimizers.

 

  

S-OK:

 Shows the status of the connection to the internet and to the SolarEdge  

Monitoring Server.

Summary of Contents for SOLraise

Page 1: ...Quick Start Guide SOLON SOLraise EN SOLON SOLraise Quick Start Guide ...

Page 2: ...nnect the DC outputs of the SOLON SOLraise modules in series a The minimum string length is 8 SOLON SOLraise modules b Do not connect more than 5 2 kW in a single string to a single phase inverter c Parallel strings do not need to be the same length Check the connections Before the inverter is switched on the SOLON SOLraise modules each supply a safety voltage of 1 V that you should check with a v...

Page 3: ...able Make sure that the inverter is correctly grounded Connect the Ethernet cable internet connection or RS485 cable inverter coupling if required Caution When the PV system is connected to the Internet the IP address and the serial numbers of the modules power optimizers and inverters are transferred to the monitoring server If this is not desired do not connect the PV system to the Internet The ...

Page 4: ...display language and configuration of the communication options and adapt these as necessary You access the menu via the ENTER button press and hold ENTER for 5 seconds and then enter the password 12312312 3 Check the following information on the LC display Vac Mains voltage V Vdc Total string voltage V approx 1 V for each PowerBox connected in series Pac Power fed into the mains grid W P OK Shows...

Page 5: ...tes for all PowerOptimizers to signal their readiness for operation SolarEdge inverters are designed for global use and must be configured for use in each Country If the inverter has not been configured it may display a voltage or frequency error at first startup Incorrect configuration will not damage the inverter but it will not operate normally unless properly configured Inverter configuration ...

Page 6: ...6 11 12 SOLON Energy GmbH Am Studio 16 12489 Berlin Germany Phone 49 30 81879 8010 Fax 49 30 81879 9333 E Mail installation solon com Internet www solon com global solraise ...

Reviews: