Commissioning and activating the system
1. Switch the AC circuit breaker ON.
Safety information
High voltage, handle with care.
2. Use the operating buttons and the LC-display of the inverter to check the correctness of the
country code, display language and configuration of the communication options (and adapt
these as necessary). You access the menu via the ENTER button (press and hold ENTER for 5
seconds and then enter the password
12312312
).
3. Check the following information on the LC-display:
Vac:
Mains voltage (V).
Vdc:
Total string voltage (V) (approx. 1 V for each PowerBox connected in series).
Pac:
Power fed into the mains grid (W).
P-OK:
Shows the number of connected PowerOptimizers.
S-OK:
Shows the status of the connection to the internet and to the SolarEdge
Monitoring Server.