III. Scope of delivery
The installation height is between 1400 and 1600
mm (from the floor to the bottom of the EV charger
housing).
1400-1600mm
The installation location must be freely accessible.
Energy meterX1
230mm
3
6
0
m
m
The installation requires at least
an area of 230 mm x 360 mm.
1
A solid and an even support
surface, e.g. concrete or masonry,
must be available for mounting.
2
A minimum clearance of 200 mm
from other equipment or objects
must be maintained.
3
4
5
2
ENGLISH
Summary of Contents for SOL APOLLO Series
Page 135: ......