24
6. Use of the Free Standing Pellet Fire
Recommendations
Before starting up the unit, please check the following:
Guarantee that the unit is properly connected to the power mains using the 230VAC
power cable.
Figure 19
– Electric power plug.
Check to see whether the pellet reservoir is supplied with pellets. Inside the pellet
reservoir is a safety grid to prevent users from reaching the worm screw.
Ensure that before each lighting the burner is clear
The unit's combustion chamber is made out of iron plate and painted with high
temperature-resistant paint, releasing fumes during the first burning sessions due to
paint curing.
Make sure that the hydraulic circuit was correctly assembled and is connected to the
water supply (only for the backboiler model);
You should check that there is sufficient ventilation in the room where the unit is installed,
otherwise it will not work properly. You should therefore check to see whether there are
other heating air-consuming units in the room (e.g. gas units, fire pits, extractors, etc.);
these should not be used simultaneously with the unit.
Summary of Contents for Alpes 10 kW
Page 22: ...19 b c Figure 17 Examples of standard installations ...
Page 52: ...49 b c d e f g Figure 33 Installation of the UPS kit ...
Page 61: ...58 a b c d e f ...
Page 70: ...67 13 5 Symbols Figure 60 Symbols ...
Page 71: ...68 14 Electrical diagram of the Free Standing Pellet Fire unit Figure 61 Electrical diagram ...
Page 78: ...75 ...