SUPPLYING THE SOM-A-TROL
®
WITH POWER
Bring the (4 wire) customer power supply to the top right side of the Som-A-Trol
®
and connect to the panel disconnect and ground lug. (See Diagram and
Installation Drawings.)
All close couple systems are prewired; there is a prewired junction box mounted
to the side of the extractor shell. Inside this prewired junction box there will be
terminals that are the same as in the panel. Install conduits from the panel to the
pre-wire junction box, pull the motor wires and control wires thru these conduits
separately and do your final wire terminations matching numbers from panel to
pre-wire junction box.
REMOTE PUSH BUTTON STATION
Mount the remote push button station, run the conduit from the remote push
button station to the prewired junction box then pull the wires from the remote
push button station to the prewired junction box and do your final hookups in the
prewired junction box.
WARNING:
Improper connection of the equipment grounding conductor can result in a risk of
electrical shock. An equipment grounding conductor must be run with the circuit
conductors and connected to the pulper/extractor grounding terminal.
Summary of Contents for SPC-75S
Page 12: ...Installation ...
Page 16: ...MOUNTING DETAIL OF TROUGH ...
Page 21: ...FOR REFERENCE ONLY ...
Page 22: ...Start Up ...
Page 26: ...Operation ...
Page 32: ...CLEANING YOUR SYSTEM ...
Page 38: ...MAINTENANCE ...
Page 49: ...TROUBLESHOOTING ...
Page 56: ...REPLACEMENT PARTS EXPLODED VIEWS ...
Page 57: ......
Page 60: ......
Page 62: ......