Copyright © 2018 SOMFY ACTIVITÉS SA, Société Anonyme. All rights reserved.
EN
5
2. INSTALLATION
Instructions which
must
be followed by the drive and home automation professional installing the Movelite
TM
motor.
Never drop, knock, drill or submerge the drive.
Install a separate control point for each drive.
Safety warning!
Information
Caution!
2.1. INSTALLATION
2.1.1. Installation of the rail (Fig A)
1) Mark the position of the brackets.
2) Drill the ceiling or the wall at the right places.
3) Attach the brackets.
4) Attach the rail on the brackets.
2.1.2. Installation of the motor (Fig B)
1) Unlock the motor
2) Insert the motor shaft into the drive pulley hole.
3) Lock the motor.
For the illustration, see page 99.
2.2. WIRING
(Fig C)
Cables which pass through a metal wall must be protected and isolated using a sheath or sleeve.
Attach cables to prevent any contact with moving parts.
Leave the drive power supply cable accessible: it must be possible to replace it easily.
-
Switch off the power supply.
-
Connect the drive according to the information in the table below:
AC wiring
(Fig C1)
Never connect 2 control points to a single drive
(Fig C2)
DCT wiring
(Fig C3)
Compatible controls - Wiring of control
(Fig D)
1) Inis Uno
2) Série espace
3) Centralis Uno IB
4) Setting tool
2.3. COMMISSIONING
Setting can be done only when one of the two live wires are connected permanently to the power.
2.3.1. Setting the end limits
1) Switch on the power supply.
2) After the first
Open
or
Close
command, the motorised product will run at reduced speed to one end, then the
other, to set the End Stops.
1
CCW (Open) NO Dry contact
4
2
5
Stop - NO Dry contact
3
Ground Common
6
CW (Close) NO Dry contact
Wire
100V to 240V
1
Neutral
Blue
2
Live
Brown
3
Live
Black
4
Earth
Yellow / Green