INITIAL START-UP
Page 15
7
Initial start-up
7.1
Connecting the power supply
Requirements:
The machine is mounted on the wall/a gantry stand.
Steps:
1.
Connect the machine to the wall outlet with the 16 A-CEE device connector using an extension cable with
phase shifter.
7.1.1
Check for the correct direction of rotation
Requirements:
The machine is connected to a power outlet.
Steps:
1.
Switch on the machine and then switch off again immediately.
2.
Watch the fan blades through the motor ventilation grille.
An arrow above the ventilation grille indicates the correct direction of rotation.
3.
In case of an incorrect direction of rotation, rotate the phase inverter in the extension cable through two
phases (no electrician required).
8
Operation
The machine must only be deployed for its intended use (see Section 1.6 "Intended use").
The machine is operated in manual mode.
8.1
Basic checks before and after operations
Familiarise yourself with your workplace before starting work. You must check the machine for signs of visible
defects at least once a day (visual check). The intervals for inspection and maintenance work as found in section 9
"Maintenance and care" must be observed.
Before switching on the machine and during operation, monitor the whole machine constantly for irregularities. The
following features may indicate irregularities when the control system and the machine are switched on:
increased noise, noise occurring at irregular intervals/unusual noises.
Unusual smells.
Smoke development.
Diminished performance during operation.
Immobilise the machine immediately upon the first signs of any of the above issues. Inform the person responsible
immediately in order to evaluate the technical status. If a failure is anticipated due to the damage, perform repairs
without delay.
8.2
Operating elements
The Operating elements are described in section 4 "Setup and function".