Get to know your Sonel EVSE-01 inside out with our free User Manual. Download the manual from our website and discover all the features and functionalities of this innovative product. A must-have resource for all EV owners. Download it for free now!
EVSE-01
– USER MANUAL
14
Page 1: ...4...
Page 2: ...4...
Page 3: ...USER MANUAL ADAPTER FOR TESTING VEHICLE CHARGING STATIONS EVSE 01 FOR MPI METERS SONEL S A Wokulskiego 11 58 100 widnica Poland Version 1 03 10 07 2020...
Page 4: ...ings 5 5 Measurements 6 5 1 Automatic measurements 6 5 2 Manual measurements 8 5 3 Control signal CP 10 6 Cleaning and maintenance 11 7 Storage 11 8 Dismantling and utilisation 11 9 Technical data 11...
Page 5: ...health and safety regula tions and with other relevant fire regulations required during the performance of a particular type of work The adapter must not be used for networks and devices in areas with...
Page 6: ...vidual measurements Perform measurements for all required com binations of settings CP C or D with these settings you can measure the fault loop impedance and test residual current circuit breakers CP...
Page 7: ...ing etc EVSE 01 provides a simulation of situations when the charged object is connected to the charging source via a ca ble with a pre set maximum current PP and the charging cycle is in a mode set o...
Page 8: ...of the meter Select the test required for your meas urements Enter the settings required during the tests For test ZL N ZL L ZL PE RCD protection of phases L1 L2 L3 supplying the charger method for ca...
Page 9: ...work Set CP C or D RCD results from the safety device of the charger Set CP C or D RISO results from the basic insulation of the charger Set CP B After completion of the measurement a summary is displ...
Page 10: ...e test Connect EVSE 01 to the meter If you test 3 phase chargers use banana socket cables If you test 1 phase charger use banana socket cables or WS adapter If you use the WS adapter for testing a 3 p...
Page 11: ...If you test RCD you need to measure L1 PE L2 PE L3 PE If you test RISO you need to measure L1 PE L2 PE L3 PE N PE or L1 L2 L3 N PE Enter settings to EVSE 01 and start the measurement Before and during...
Page 12: ...ation can supply The cur rent value can be determined based on the following table contained in EN 61851 1 standard NOTE Test CP signal in relation to the PE line We recommend using a battery powered...
Page 13: ...onic equipment should be gathered selectively i e it must not be placed with waste of another kind Worn out electronic equipment should be sent to a collection point in accordance with the law of wast...
Page 14: ...tion state E error CP short to PE i socket types measuring sockets L1 L2 L3 N PE 1 phase socket CP signal socket PWM communication j test lead length EVSE 1 m MPI 0 5 m k operating temperature 5 45 C...
Page 15: ...I 530 MPI 525 MPI 520 MPI 502 Auto measurements Automatic three phase measurement via multiplug Visual inspection Fault loop ZL PE ZL N parameters measure ment 6 mA RCD test RCD test AC A F B B EV AC...
Page 16: ...EVSE 01 USER MANUAL 14...