MPI-525
– USER MANUAL
41
3.8 Checking sequence of phases
Set the rotary
switch of
function selection
at
L
1
L
3
L
2
L
1
L
3
L
2
position.
Connect the meter to the installation according to the drawing.
The arrow rotates
clockwise: correct
sequence of
phases;
the arrow rotates
counterclockwise:
incorrect sequence
of phases.
Phase-to-phase
voltages.
Signalling the
presence of
individual phases.
Summary of Contents for MPI-525
Page 1: ......
Page 2: ......
Page 70: ...MPI 525 USER MANUAL 68 NOTES...
Page 71: ......
Page 72: ...MPI 525 USER MANUAL 70...