MPI-535
– BRIEF USER MANUAL
25
3.8
Checking sequence of phases
Select item
1-2-3
, to call up the
measurement screen.
Connect the meter to the installation according to the drawing.
The phase sequence is
correct
,
i.e. the phase sequence is in
clockwise
direction.
The phase sequence is
incor-
rect
, i.e. the phase sequence is
in
anticlockwise
direction.