10
Connect
the test
leads
as shown
on the
drawing.
Connecting
N
conductor
is
necessary
for pulsed
current
with direct
current
offset and
for direct
current.
The meter is ready
for measurement.
U
L-PE
voltage
Perform measurement by pressing
START
push-
button.
Read the main
measurement result
I
A
current.
To read additional results, press
.