MRU-200
● MRU-200-GPS – USER MANUAL
14
2.4.7 Programme update
NOTE!
Before you proceed to programming, charge the accumulators.
During programming do not turn the meter off or disconnect the transmission ca-
ble.
Before you proceed to updating the programme
, download from the manufacturer’s web page
(www.sonel.pl) the meter programming software, install it in the computer and connect the meter to
the computer.
Having chosen the
Program update
in the MENU, proceed in accordance with the instructions
displayed by the programme.
2.5
Language choice
Use buttons
and
to select
**Language choice**
in the main MENU and press
ENTER
.
Use buttons
and
to select the language and press
ENTER
.
2.6
Information on the manufacturer
Use buttons
and
in order to select
Product info
and press
ENTER
.