MRU-200
● MRU-200-GPS – USER MANUAL
30
To start the measurement, press
START
push-button again.
After the measurement of the first leg of the pole, the measured resistance val-
ue of the tested leg is shown on the main screen as R1 for 5 seconds. After this
time, the meter transfer R1 result to the window on the right side and displays a
message to the user to connect the clamps to another leg of the pole.
This result may be restored on the main screen for another 5 seconds by
pressing
ENTER
.
After performing the measurement on the last leg of the pole and
displaying for 5 seconds the resistance result "Rn", the device
displays the resultant earth resistance R
E
.
Use buttons
and
to change results displayed in the window on
the right side of the screen.
By pressing the
F4
button you can display GPS coordinates.