9. 4. Maintaining and Cleaning the Hoist Unit
(1) Tightening the waterproof packing
If water leakage occurs at the gland of the hoist unit, uniformly tighten the four M12
gland retaining bolts shown in 9. of section 7.1.
(2) Lubricating the hoist unit
(3)
防錆亜鉛板交換について
(
上架時作業
)
電蝕防止の為に、亜鉛板
(
ジンクプレート
)
がドームフランジ部に取付てあります。
(9.1
の
⑮
)
上架の際に必ず交換して下さい。
Lubricate the parts of the hoist indicated by circles in the figure at
left, once a month.
When applying grease, first wipe away the dirty grease. If
lubrication was not carried out for a long period, apply an
additional amount of grease to prevent rusting.
1. Sliding part of Up/Down pipe
: Grease
2. Hoist feed screw
: Grease
3. Hoist guide rod
: Grease
Mechanical part of the hoist unit
Summary of Contents for KCS-5200
Page 1: ...Model KCS 5200 Color Scanning Sonar Operation Manual Ver 1 48 E Rev 0...
Page 2: ......
Page 14: ......
Page 22: ...2 4...
Page 28: ...3 6...
Page 50: ...5 16...
Page 78: ...6 28 Menu Screen Sub Screen Orthogonal Display Axis...
Page 80: ...6 30...
Page 84: ...7 4...
Page 90: ...8 6...
Page 106: ...9 16...
Page 116: ...10 10...