II-85
6. Set the fishing rods.
7. Put the standard ball in a bucket filled with surfactant water (soapy
water) and clean it thoroughly.
* After cleaning it, be careful not to touch with the hands.
8. Tie the ends of the reel lines (1) and (2) with the end of the rope on the
port side. (See Fig. 2-96.)
9. Pull the synthetic fiber thread upward with the rope on the starboard
side.
10. Unspool reel lines (1) and (2) at the same time.
11. When the knot reaches the starboard side, move the rope to the ship
bottom. (So that the procedure can be returned to Step 8 if the line is
cut.)
12. Hold the ends of three reel lines together to form a circle with these
lines.
13. Into this circle, set the calibration ball prepared as shown in Fig. 2-91.
14. When the calibration ball (
φ38.1mm) reaches the water surface, set the
counter of Reel (3) to zero.
15. When the calibration ball (38.1 mm diameter) exactly reaches the water
surface, set the counter of reel (3) to 0 m.
16. Unspool Reel (3) and spool Reels (1) and (2) to move the calibration
ball to the port side.
17. When the calibration ball reaches the water surface, set the counters of
Reels (1) and (2) to zero.
18. Adjust the reel line length to install the calibration ball on the directional
axis of the transducer for measurement.
* Drop the calibration ball about 20m from the transducer, taking account
of the water s draft + projection.
Summary of Contents for KSE-310
Page 1: ...KSE 310 TYPE FISH SIZING ECHO SOUNDER Instruction Manual Ver 5 04E SONIC CORPORATION ...
Page 2: ... MEMO ...
Page 163: ...III 153 ...
Page 166: ...III 156 3 2 1 CURSOR CONTROL This is described in Section 2 9 ...
Page 186: ...Ⅲ IV 14 Fig 4 13 NET DEPTH Display Method dialog ...
Page 196: ......