background image

 

SECTION 1 – INSTALLATION 

 

INSPECTION 

 

Prior to installing the atomizer, perform a visual inspection to detect any evidence of 

damage, which might have occurred during shipment. Before disposing of any packaging 

material, check it carefully for small items. 

 

It was carefully packed and thoroughly inspected before leaving our factory. The carrier, 

upon acceptance of the shipment, assumed responsibility for its safe delivery. Claims for 

loss or damage sustained in transit must be submitted to the carrier.  

 

If damage has occurred, contact your carrier within 48 hours of the delivery date. 

DO 

NOT OPERATE DAMAGED EQUIPMENT. 

Retain all packing materials for future 

shipment. 

 

ELECTRICAL REQUIREMENTS 

 

The atomizer requires a fused, single phrase 3-terminal grounding type electrical outlet 

capable of supplying 50/60 Hz at 100 volts, 115 volts, 220 volts, or 240 volts, depending 

on the voltage option selected. For power requirements, check the label on the back of the 

unit.  

Should it become necessary to convert the unit for different voltage operation, proceed as 

follows. 

 

1.

 

Ensure that the power cord is not connected to the electrical outlet.

 

2.

 

Open the fuse holder cover using a small screwdriver.

 

3.

 

Pull out the red fuse holder from its housing.

 

4.

 

To convert from 100/115V to 220/240V replace the two 3 Amp slow blow fuses, 

with two 1.6 Amp fuses.

 

5.

 

To convert from 220/240V to 100/115V reverse the procedure above.

 

6.

 

Rotate the fuse holder 180º from its original position, and reinsert it into its 

housing. For 100/115V operation the voltage displayed should be 115. For 

220/240V operation the voltage display should be 220.

 

7.

 

Change the electrical power cord as required.

 

 

WARNING 

For your personal safety, do not, under any 

circumstances, defeat the grounding feature of the 

power cord by removing the grounding prong. 

Summary of Contents for VCX 130 AT

Page 1: ...ds General Information SECTION 1 INSTALLATION Inspection Electrical Requirements Installing the Ultrasonic Atomizer SECTION II OPERATION Functions of Controls Indicators and Connectors Preparations fo...

Page 2: ...in connection with the sale of its products The manufacturer hereby disclaims any warranty of either merchantability or fitness for a particular purpose No person or company is authorized to change mo...

Page 3: ...in a manner contrary to that specified in this instruction manual the protection features designed into the unit may be impaired When mounting the atomizer in a stand always clamp the converter housi...

Page 4: ...ces kept to a minimum A wide variety of coatings chemicals lubricants and particulate suspensions can readily be atomized However factors such as viscosity miscibility and solid content deserve consid...

Page 5: ...0 60 Hz at 100 volts 115 volts 220 volts or 240 volts depending on the voltage option selected For power requirements check the label on the back of the unit Should it become necessary to convert the...

Page 6: ...free from excessive dust dirt explosive and corrosive fumes and extremes of temperature and humidity CAUTION Operating the equipment with voltages different from those specified or with voltages with...

Page 7: ...REVIEW Key Used to enter the amplitude selected and view amplitude power and energy START STOP Key Starts or stops the ultrasonics In the STOP mode the red indicator goes off Key Switches the main pow...

Page 8: ...s the fuse s 9 PIN D SUB CONNECTOR Pin No Description 1 Not connected 2 Not connected 3 Not connected 4 Enables connection to a frequency counter 5 Enables connection to an external power monitor 5 mv...

Page 9: ...he converter housing only Do not secure the clamp to the probe 5 Connect the converter cable to the power supply CAUTION Do not operate an atomizer that has been in a very cold or hot environment for...

Page 10: ...ination of level sensor and inlet valve Pressure reducing regulators should be used when working with high pressure delivery systems Optimum atomization can only be obtained by empirically adjusting t...

Page 11: ...11 Do not operate the probe when the ambient temperature or temperature of the liquid exceeds 158 F 70 C...

Page 12: ...sonics is off press the AMPL key and the key for a 40 reading on the screen the screen will display Amplitude Setting 40 and then press the ENTER REVIEW key The screen will display The atomizer is now...

Page 13: ...urn the ultrasonics off plug in the footswitch or remote actuation device into the footswitch jack and depress the switch again to turn the ultrasonics back on Depressing the footswitch or closing the...

Page 14: ...s has failed proceed as follows 1 Turn the unit off by depressing the key and disconnect the line cord from the electrical outlet 2 Open the fuse holder cover using a small screwdriver and pull out t...

Page 15: ...necessary delay Care should be exercised to provide adequate packing to insure against possible damage in shipment The atomizer should be sent to the Service Department with all transportation charges...

Reviews: