9
35-50°
Montagehinweise
Assembly instructions
Istruzioni di montaggio
Instructions de montage
Instrucciones de montaje
EN
General and transport information
7KHLQVWDOODWLRQPD\RQO\EHFDUULHGRXWE\DTXDOL¿HGSURIHVVLRQDO7KHLQVWUXFWLRQVSURYLGHGKHUHDUHGLUHFWHGDW
TXDOL¿HGSURIHVVLRQDOVRQO\7KHVXSSOLHGPDWHULDOVPXVWEHXVHGIRUWKHLQVWDOODWLRQ3ULRUWRLQVWDOOLQJDQGRSHUD
ting the solar panel system, familiarise yourself with the standards and regulations valid at the site in question. We
recommend that you use a carrying strap to transport the solar collector. You must not lift the solar collector by its
connections or screw threads. Do not jolt the collector or allow parts of it to be affected by mechanical factors. This is
particularly important for the glass, rear panel, and pipe connections.
Structural engineering aspects
7KHV\VWHPPD\RQO\EHLQVWDOOHGRQDURRIVXUIDFHRUVXEVWUXFWXUHZLWKDVXI¿FLHQWORDGEHDULQJFDSDFLW\7KHVWDWLF
load-bearing capacity of the roof or substructure must be checked in accordance with local and regional stipulations at
the site prior to the installation of the panels, if necessary by means of the commissioning of a structural engineer. In
SDUWLFXODULWLVLPSRUWDQWWRFKHFNZKHWKHUWKHTXDOLW\RIWKHZRRGHQVXEVWUXFWXUHLVVXI¿FLHQWWRHQDEOHWKHGXUDELOL
ty of the screw connections for attaching the panel mounting apparatus. The onsite checking of the system (collectors
DQGDWWDFKPHQWDSSDUDWXVDVSHU(1DQGRUFRXQWU\VSHFL¿FOHJLVODWLRQLVSDUWLFXODUO\LPSRUWDQWLQDUHDVSURQH
to heavy snow or high winds. All features of the installation site (foehn wind, venturi effect, vortex formation etc.) that
might result in higher stresses at the site in question must be investigated.
,QIRUPDWLRQUHJDUGLQJÀDWURRIV
7KHLQVWDOODWLRQRIDFROOHFWRU¿HOGLVFDUULHGRXWRQDSUHH[LVWLQJURRI$WWLFV
with a special construction or that are used for residential purposes and roof pitches that are below the minimum re-
commended value require (in relation to the cladding) additional measures to be carried out by the customer in order
to protect against the penetration of water as a result of wind force and driving snow. This might include sub-roof
membranes, for example. When selecting the installation site, note that the maximum permitted loads must not be
exceeded as a result of snow or wind forces. To prevent inadmissible wind loads, the panels must not be installed at
the edge of a roof (e/10 zones as per EN 1991, but minimum gap of 1 m). Panels must not be installed below a height
transition so that it is not possible for excess loads to fall onto the panel system from the higher level as a result of
drifting or sliding snow. If, to solve this problem, snow catchers are installed on the higher level, the statics of the
KLJKHUOHYHOPXVWDOVREHFKHFNHG,QWKHFDVHRIODUJHUFROOHFWRU¿HOGVZHUHFRPPHQGWKDW\RXPRXQWWKHSDQHOVRQ
DVHSDUDWHEHDULQJVWUXFWXUHPDGHIURPVWHHOSUR¿OHV$WWDFKPHQWXVLQJFRQFUHWHEDOODVWEORFNVHQDEOHVWKHV\VWHP
to be installed without penetrating the roof cladding. If the panels are mounted on concrete ballast blocks, rubber
underlays must be used to increase the static friction between the concrete ballast blocks, thus preventing damage to
the roof cladding.
Lightning protection/building potential equalisation
$VSHUWKHVWLSXODWLRQVRI/LJKWQLQJ3URWHFWLRQ6WDQGDUG(13DUWVWRWKHFROOHFWRU¿HOGPXVWQRWEHFRQ
QHFWHGWRWKHEXLOGLQJµVOLJKWQLQJSURWHFWLRQ%H\RQGWKHVFRSHRIYDOLGLW\RIWKLVVWDQGDUGFRXQWU\VSHFL¿FOHJLVODWLRQ
must be observed. A safety gap of at least 1 m from any adjacent object that may be conductive must be left. In the
FDVHRILQVWDOODWLRQVRQWRSRIH[LVWLQJPHWDOVXEVWUXFWXUHVDQDXWKRULVHGDQGTXDOL¿HGHOHFWULFLDQPXVWEHFRQVXOWHG
To enable potential equalisation of the building, the metallic conductor pipes of the solar circuit and all of the collector
KRXVLQJ¿[WXUHVPXVWEHFRQQHFWHGWRWKHPDLQHTXLSRWHQWLDOEXVEDULQDFFRUGDQFHZLWK(1DQGRUFRXQWU\
VSHFL¿FOHJLVODWLRQE\DQDXWKRULVHGDQGTXDOL¿HGHOHFWULFLDQ
Connections
Depending on the execution, the panels are to be connected with each other and/or to the connecting pipework by
PHDQVRIÀDWVHDOLQJDQGXVLQJVFUHZHG¿WWLQJVLQWHUQDOH[WHUQDOWKUHDG,WLVLPSRUWDQWWRPDNHVXUHWKDWWKHÀDW
JDVNHWVDUHSURSHUO\VHDWHG,IQRÀH[LEOHWXEHVDUHDYDLODEOHIRUXVHDVFRQQHFWLRQHOHPHQWVPDNHVXUHWKDWWKH
FRQQHFWLQJSLSLQJDOORZVIRUSUHFDXWLRQVWRFRPSHQVDWHIRUWKHWKHUPDOH[SDQVLRQFDXVHGE\WHPSHUDWXUHÀXFWXDWLRQV
HJ([SDQVLRQEHQGVDQGÀH[LEOHSLSLQJVHHWKHLQIRUPDWLRQRQFROOHFWRUFLUFXLWU\RSHUDWLQJUHFRPPHQGDWLRQV,Q
WKHFDVHRIODUJHUFROOHFWRU¿HOGVWKHLQWHUPHGLDWHSODFHPHQWRIH[SDQVLRQEHQGVÀH[LEOHSLSLQJLVUHTXLUHG&$87,
ON: Check the pump design). When the connections are tightened up, pliers or another wrench must be used as a
counter wrench in order to prevent the absorber from being damaged.
Collector inclination/general information
The collector is suitable for an inclination of between 15º and 75º. The collector connections and venting openings
must be protected so that water and contamination such as dust cannot enter them.
Warranty
Guarantee claims are only valid if the system has been used in conjunction with the supplier‘s original frost protection
agents and if the system has been properly installed, commissioned, and maintained. The system must have been in-
VWDOOHGE\DTXDOL¿HGSURIHVVLRQDODQGWKHLQVWDOODWLRQLQVWUXFWLRQVPXVWKDYHEHHQIROORZHGZLWKRXWH[FHSWLRQLQRUGHU
for any claim to be valid.