The installation may only be carried out by qualified personnel. Only the supplied material should be used for the
installation. Please inform yourself about the applicable local norms and regulations before mounting and
operating the solar system. Note: Installing a collector array signifies an intervention into an existing roof. Roof
coverings, e.g. tiles, shingle and slate, especially in the case of converted and inhabited loft spaces or roofs with
less than the minimum slope (with regards to the covering), require additional on-site measures, e.g. sarking, as
security against water penetration caused by wind pressure and driving snow. For large collector arrays it is often
advantageous to mount the collectors on a special supporting structure made of steel channels. This substructure
and its connections to the main building structure should be designed on-site in accordance with the local
conditions. Alternatively, it is possible to install the collectors without perforating the roof membrane by using
concrete ballast with guys. The collectors are mounted on concrete blocks. Rubber mats should be used if
necessary to protect the roof membrane against damage and to increase the friction between the roof and the
ballast blocks. In addition, it is necessary to secure the collectors with 5mm steel cables (minimum tensile strength
1450N/mm²) to absorb any peak wind loads. The permissible roof loading and the fixing points on the building
for the steel cables should be verified on-site by a structural engineer.

The use of a carrying strap is recommended for transporting the collector. The collector must not be lifted at the
connections or on the threading. Avoid impacts and mechanical action on the collector, especially on the solar
glass and the pipe connections. If the aluminium tray collectors have a protective coating, this must be protected
from sunlight and removed just before installation.

Structure

The collectors may only be mounted on sufficiently load-bearing roof surfaces and substructures. The structural
load-bearing capacity of the roof and the substructure must be tested on-site before mounting the collectors.
Here, particular attention should be paid to the quality of the timber substructure in terms of the stability of the
screw joints necessary for installing the collectors. In particular, it is essential to have the entire collector structure
verified at the installation site according to DIN 1055, Part 4 & 5 or according to country-specific regulations in
regions with heavy snowfalls (Note: 1m³ powder snow ~ 60kg/1m³ wet snow ~ 200kg) or in regions with high
wind speeds. The assessment should also take into account any special features of the particular site that could
lead to increased loads (foehn wind, air jets or eddy formations, etc). Collector arrays should always be installed
in such a way that any possible snow piles caused by snow trap grids (or the position of the collectors) do not
reach the collectors. Here must be at least 1m distance from roof ridging or edges.

Lightning protection / Equipotential bonding of the building

In accordance with the lightning protection standard ÖVE/ÖNORM EN 62305 Part 1-4 the collector array cannot
be connected to the building's lightning protection. A safety distance of at least 1 m must be maintained from any
possible adjacent conducting object.  For installations on metal substructures at the installation site, generally
qualified electricians must be consulted. To carry out a building potential equalisation, the metal tubes of the solar
circuit and all collector cases or fastenings must be connected to the main potential equalisation bus by a qualified
electrician in accordance with ÖVE/ÖNORM E 8001-1 or the country-specific standards.

Connections 

(screw connections)

Depending on the design, the collectors must be connected with one another and/or the connection pipes using
screw fittings (1" internal/external thread) with flat-face sealing. Ensure correct placement of the flat gaskets. If
flexible pipes are not used as connectors, precautions must be taken to protect the connection pipes against
temperature fluctuations caused by heat expansion (expansion bends/flexible piping). In this case, no more than
6 collectors may be connected in series. Larger collector arrays must be assembled with expansion bends or
flexible members inserted in the links (IMPORTANT: check the pump design). When tightening the connections,
always apply counter-pressure with a wrench or another spanner to prevent damage to the absorber.

Collector inclination / General notes

The collector is suitable for angles between 15° (minimum) and 75° (maximum). Steps must be taken to ensure 
that water and other contaminants such as dust, etc. are prevented from getting into the collector connections 
and ventilation holes.

Connecting support rails

If several support rails are to be mounted in series, they must be connected with the connectors above and below.

Warranty

Warranty claims can only be made if the supplier's own antifreeze is used and maintenance is carried out correctly.

Summary of Contents for SK500 FKP

Page 1: ...nnn jfee ebiX k Zfd Xe YlZ_ DXelXc DXelXc DXel c DXelXc D GB I F E JB JJG BG...

Page 2: ......

Page 3: ...a viti prigioniere in parallelo SSP 25 Montaggio mediante viti prigioniere in parallelo tetto in ardesia 28 Dimensioni collettore Raccomandazione per i punti di fissaggio 29 Fissaggio dei giunti aggr...

Page 4: ...s keine personenunabh ngige Absturzsicherun gen oder Auffangvorrichtungen vorhanden sind kann es ohne Benutzung von Sicherheitsgeschirren zu Abst rzen aus gro en H hen und damit zu schweren oder t dli...

Page 5: ...er or sinking into the ground e g using wider feet feet suited to the ground or hooking devices If non personal fall protection or fall arrest systems are not provided working without the use of suita...

Page 6: ...la superficie d appoggio usando dispositivi di aggancio Qualora non esistano dispositivi anticaduta e di salvataggio la mancata adozione di imbracature di sicurezza pu essere causa di caduta da grandi...

Page 7: ...pieds d chelle en adaptant les pieds au sol ou l aide de dispositifs d accrochage Si aucune protection antichute ou de rattrapage n est pr vue et si aucun harnais de s curit n est utilis il y a risque...

Page 8: ...gu a adecuados para el suelo o dispositivos de suspensi n Si no dispone de dispositivos antica das o de protecci n corre el riesgo de exponerse a ca das desde grandes alturas que sin el uso de arneses...

Page 9: ...es ge samten Kollektoraufbaues gem DIN 1055 Teil 4 und 5 bzw gem den l nderspezifisch geltenden Vorschriften ist besonders in schneereichen Gebieten Hinweis 1 m Pulverschnee 60 kg 1 m Nassschnee 200 k...

Page 10: ...ential to have the entire collector structure verified at the installation site according to DIN 1055 Part 4 5 or according to country specific regulations in regions with heavy snowfalls Note 1m powd...

Page 11: ...ntelatura in base alle norme DIN 1055 parti 4 e 5 o secondo le norme vigenti del rispettivo paese si richiede soprattutto in zone soggette a forti precipitazioni nevose Indicazione 1 m di neve farinos...

Page 12: ...solaires Pour ce faire pr tez une attention toute particuli re la qualit du bois de la sous construction pour assurer la solidit des raccords destin s fixer les dispositifs de montage des capteurs Le...

Page 13: ...capteurs et les ouvertures d a ration de purge contre les intrusions d eau ainsi que contre les salissures comme les entr es de poussi res etc Fixation des rails de support Si plusieurs rails de supp...

Page 14: ...de montaje de los colectores Particularmente en regiones de abundantes nevadas y o fuertes vientos es preciso que el propietario haga comprobar la totalidad de la estructura del colector conforme a D...

Page 15: ...ollektorfeldvorlauf am n chsten gelegenen F hlerh lse zu montieren Um optimalen Kontakt zu gew hrleisten ist der Spalt zwischen F hlerh lse und F hlerelement mit geeigneter W r meleitpaste auszuf llen...

Page 16: ...sleeve nearest to the collector array flow To ensure optimal contact between the sensor and the surrounding environment the gap between the sensor sleeve and the sensor element should be filled with...

Page 17: ...alla mandata del campo collettori Per garantire il contatto ottimale occorre riempire la fenditura fra la guaina del sensore e il sensore con un grasso al silicone adatto Per il montaggio del sensore...

Page 18: ...amp de capteurs Afin d assurer un contact optimal comblez l espace situ entre la douille et le capteur de temp rature au moyen d une p te thermoconductrice appropri e Pour le montage utilisez uniqueme...

Page 19: ...del campo de colectores A fin de garantizar un contacto ptimo se deber rellenar el espacio entre la vaina y el sensor con una pasta termoconductora apropiada Para el montaje del sensor s lo deber n em...

Page 20: ...ical data Dati tecnici Donn es techniques Datos t cnicos Bruttofl che Gross area Superficie lorda Surface hors tout Area colector bruta 2 57 m Inhalt Contents Contenuto Contenance Contenido 1 6 l Aper...

Page 21: ...e values in the table are only guide values If there are many additional resistances bends fittings etc or if the pipe lengths are 20 to 30m one size bigger should be selected Avvertenza La tabella so...

Page 22: ...egno Foret taraudeur 8 mm bois Broca espiral 8 mm para madera Steinbohrer 14 mm Ziegel 14mm stone drill brick Punta da muro 14 mm mattone M che pierre 14 mm tuiles Broca para piedra 14 mm para ladrill...

Page 23: ...orsa di fissaggio con foro 13 mm Pi ce de serrage 13 mm Pieza de apriete 13 mm TRPN1 110102 Trageschiene Support Mounting rail Barra portante Rail de support Carril portador regleta TRPN2 110103 Trage...

Page 24: ...a general de los materiales 24 UL8 110139 Unterlegscheibe M8 M8 washer Rondella M8 Rondelle M8 Arandela M8 MU8 110135 Sechskantmutter M8 M8 hex nut Dado esagonale M8 Ecrou six pans M8 Tuerca hexagonal...

Page 25: ...puntos de fijaci n en el cabrio se deben medir de forma exacta 1 A SK500N 203 cm SK500L 119 cm Befestigungspunkte ausmessen Empfehlungen siehe Seite 28 29 Measure the attachement points for suggestion...

Page 26: ...del giunto di ca 20 30 mm Tagliare la parte sporgente della vite prigioniera In successione dado giunto 13 mm rondella dado Ajuster les pi ces de serrage une hauteur commune et fixer distance entre le...

Page 27: ...rail de support capteur Colocar los colectores y atornillar a los carriles portadores Secuencia tornillo arandela carril portador colector 9 Verbinden von weiteren Trageschienen Reihenfolge Schraube S...

Page 28: ...es not give way e g piece of wood Riempire l apertura cos praticata con un materiale resistente ad es un pezzo di legno Remplir la d coupe avec un support r sistant par ex morceau de bois Rellene el r...

Page 29: ...sonda Doigt de gant Vaina para sensor Einnietmutter Rivet nut Dado a rivetto crou river Tuerca remachada F hlerh lse Sensor case Boccala sonda Doigt de gant Vaina para sensor SK500N SK500L Einnietmutt...

Page 30: ...ne all aperto Recommandation pour montage sur toit plat ou au sol Recomendaciones de fijaci n para tejado plano y colocaci n al abierto o Befestigungspunkte o Attachment points o Punti di fissaggio o...

Page 31: ...di fissaggio supplementari attenersi alla norma DIN 1055 o alle norme vigenti nel rispettivo paese Dans les r gions avec une charge importante de neige ou d appel d air il convient de pr voir des con...

Page 32: ...tie la solidit de montage des capteurs au moyen d agrafes plant es dans le toit en t le mais d cline toute responsabilit pour le d tachement de la t le du toit sous l effet de la force du vent ou de l...

Page 33: ...Vorschriften entsorgt werden 6 Ma nahmen bei unbeabsichtigter Freisetzung Personenbezogene Pers nliche Schutzkleidung verwenden Vorsichtsma nahmen Umweltschutzma Verunreinigtes Wasser L schwasser zur...

Page 34: ...gaben zur Elimination Abbaubarkeit Versuchsmethode OECD 301A neue Version Analysenmethode DOC Abnahme Eliminationsgrad 70 Bewertung leicht biologisch abbaubar Zus tzliche Hinweise Sonstige kotoxikolog...

Page 35: ...onditions Contaminated extinguishing water must be disposed of in accordance with official regulations 6 Accidental release measures Personal precautions Use personal protective clothing Environmental...

Page 36: ...uct has not been tested The statement has been derived from the properties toxicity of the individual components Persistence and Elimination information degradability Test method OECD 301A new version...

Page 37: ...ndio L acqua contaminata usata per lo spegnimento deve essere eliminata in conformit con le disposizioni legislative locali 6 Misure in caso di fuoruscita accidentale Precauzioni individuali Usare deg...

Page 38: ...bili inconvenienti per l attivit di degradazione dei fanghi activi Valutazione della tossicit Il prodotto non stato esaminato L asserzione stata dedotta dalle dell acqua caratteristiche dei singoli co...

Page 39: ...mentations officielles locales 6 Mesures prendre en cas de dispersion accidentel Mesures individuelles de Utiliser un v tement de protection individuelle pr vention Mesures de protection de Retenir l...

Page 40: ...es CE50 48 h 100 mg l Plantes aquatiques CE50 72 h 100 mg l Microorganismes Effet sur la boue activ e DEV L2 1000 mg l L introduction appropri e de faibles concentrations en station d puration biologi...

Page 41: ...riesgo depende de las sustancias que se est n quemando y de las condiciones del incendio El agua de extinci n contaminada debe ser eliminada respetando las legislaci nes locales vigentes 6 Medidas en...

Page 42: ...E50 48 h 100 mg l Plantas acu ticas CE50 72 h 100 mg l Microorganismos efecto sobre el lodo activado DEV L2 1000 mg l Durante un vertido en peque as concentraciones no son de esperar variaciones en la...

Page 43: ...si declina ogni responsabilit La durata della garanzia per i collettori di 10 anni la garanzia legale per collettore e accessori di 2 anni Tutti i dati e le istruzioni contenute nel presente manuale s...

Page 44: ...Xi Jpjk dj iXeZ J8J Il JX ek olg ip 8 L E8L K c 1 0 0 Xo1 0 0 DX c1 iXeZ 7jfee ebiX k Zfd jgX X Jfee ebiX k jgX X J C CX I j eX X EXm DX i K c 1 0 0 Xo1 0 0 DX c1 jgXeX7jfee ebiX k Zfd Jfee ebiX k ek...

Reviews: