2-2 (E)
BDX-E1000
2-2. BDKP-E1002 Installation
2-2. BDKP-E1002 Installation
Install the BDKP-E1002 (DPR-93 board) on the APR-25
board.
Installation procedures
1.
Remove the APR-25 board from the BDX-E1000.
(Refer to the Section 2-1.)
2.
Fix the four PCB holders supplied with the BDKP-
E1002 to the APR-25 board.
3.
Match the connectors CN401 and CN402 on the DPR-
93 board with the connectors CN401 and CN402 on
the APR-25 board.
4.
Connect the connectors on the DPR-93 board to the
connectors on the APR-25 board while inserting the
PCB holders through the holes on the DPR-93 board.
n
Make sure that the connectors are connected tightly.
5.
Insert the APR-25 board into the Slot No.3. (Refer to
the Section 2-1.)
6.
Install the board retainer with the four screws.
7.
Close the front panel.
8.
Tighten the locking screw.
Confirmation after installation
n
In this section, describes the DVR-2000/2100 (4:2:2
Component Digital VTR) is an example as the equipment
which has the SDI output (CH5 to CH8) capability.
Perform the following confirmation if the DVR-2000/2100
(or the equivalent) is available.
1.
Connect the equipments.
PCB holders
APR-25 board
APR-25 board
DPR-93 board
PCB holder
CN401
CN401
CN402
CN402
SERIAL V/A OUT
ADVANCE OUT
CH3 (CH - 3/4)
ADVANCE OUT
CH1 (CH - 1/2)
SDI INPUT
AES/EBU INPUT
CH5/6
AES/EBU INPUT
CH7/8
MONITOR
OUTPUT
DVR-2000/2100
BDX-E1000
R
L
R
L
Speaker
system
XLR-to-BNC adaptors ( )
<Connection example>
*
: CANARE BCJ-XJ-TRA or the equivalent.
*