1-26
FVS-1000 MMP1
1-10. Installation Procedure
11. Turning on the power
(1) Turn on the power of the external switchboard.
(2) Open the lower front door of the FVS-1000, then turn on the breaker and the power switch.
[Reference]
Once the power is turned on, unless the power switch is turned off, ON/OFF of the power is possible
by only switching the breaker with the lower door closed.
Power switch
Breaker