3-54
BVW-55 P2
Installation
2. S reel motor installation
(1) Connect the harness removed in step (2) of
procedure 1 to the board of a new S reel
motor.
(2) Align the positioning hole of the S reel
motor’s board with the positioning pin on the
mechanical deck and install it with three
screws.
[Tightening torque: 20
x
10
_
2
N
.
m
{2.0 kgf
.
cm}]
Adjustment after replacement
3. S REEL FG DUTY adjustment
(Refer to Section 2-2-2.)
(A001 : S REEL FG DUTY)
4. Tape running adjustment
(Refer to Section 5-4.)
3-14. S Reel Motor Replacement
Summary of Contents for BVW-55
Page 4: ......
Page 8: ......
Page 50: ...1 40 BVW 55 1 2 3 4 5 6 7 8 9 d l s d l 1 15 Fixtures and Adjustment Equipment List ...
Page 58: ......
Page 106: ......
Page 116: ......
Page 130: ......
Page 148: ......
Page 154: ......
Page 158: ......
Page 169: ...1 9 BVW 55 P2 1 2 Fixtures and Adjustment Equipment List 1 2 3 4 5 6 7 8 9 d l s d l ...
Page 176: ......
Page 272: ......
Page 384: ......
Page 392: ......
Page 396: ...1 2 BVW 55 ...
Page 666: ......
Page 705: ......
Page 752: ......
Page 780: ......
Page 805: ......
Page 848: ......
Page 856: ......
Page 870: ......
Page 884: ......
Page 904: ......
Page 909: ...5 27 b BVW 55 5 27 b CN101 CN301 CN302 CN303 CN901 MB 838 B SIDE SUFFIX 12 MB 838 MB 838 ...
Page 911: ...5 27 a BVW 55 5 27 a CN101 CN301 CN302 CN303 CN901 MB 838 B SIDE SUFFIX 11 MB 838 MB 838 ...
Page 940: ......