5-1
BVW-55 P2
Section 5
Tape Path Alignment
5-1. General Information on Tape Path Adjustment
This section describes the fundamental knowledge such as preparation and prior knowledge to perform
the tape path system check and adjustment.
1. Index
The checks and adjustments described in Section 5-4 through Section 5-11 are closely related to each
other.
Perform the checks and adjustments referring to the following flow chart.
BEGIN
Tape running check and adjustment
Video tracking check and adjustment
CTL head height check and adjustment
CTL head position check and adjustment
AT head azimuth check and adjustment
AT head height check and adjustment
END
AT head head-to-tape contact check
AT head position check and adjustment
When adjusting the CTL head position
When adjusting the AT head height
Summary of Contents for BVW-55
Page 4: ......
Page 8: ......
Page 50: ...1 40 BVW 55 1 2 3 4 5 6 7 8 9 d l s d l 1 15 Fixtures and Adjustment Equipment List ...
Page 58: ......
Page 106: ......
Page 116: ......
Page 130: ......
Page 148: ......
Page 154: ......
Page 158: ......
Page 169: ...1 9 BVW 55 P2 1 2 Fixtures and Adjustment Equipment List 1 2 3 4 5 6 7 8 9 d l s d l ...
Page 176: ......
Page 272: ......
Page 384: ......
Page 392: ......
Page 396: ...1 2 BVW 55 ...
Page 666: ......
Page 705: ......
Page 752: ......
Page 780: ......
Page 805: ......
Page 848: ......
Page 856: ......
Page 870: ......
Page 884: ......
Page 904: ......
Page 909: ...5 27 b BVW 55 5 27 b CN101 CN301 CN302 CN303 CN901 MB 838 B SIDE SUFFIX 12 MB 838 MB 838 ...
Page 911: ...5 27 a BVW 55 5 27 a CN101 CN301 CN302 CN303 CN901 MB 838 B SIDE SUFFIX 11 MB 838 MB 838 ...
Page 940: ......