– 7 –
SECTION 3
DIAL POINTER SETTING
Note :
Follow the instaooation procedure in the numerical order given.
1
Attach TU worm to tuner chassis.
2
Attach needle, tighten needle spring using a bolt, then attach TU
LED board.
3
Rotate TU worm until needle stops at the stopper shown in Fig. A.
4
Mount PLATE BLIND and position it as shown in Fig. B.
5
Attach the band knob. Make sure that the projected part of the
tuner chassis fits as shown in Fig. C (the arrow).
6
Tighten idler gear, combine projected part of band knob and the
band slider so that they interlock, then mount to main board.
7
Mount VR gear to main board, then turn in the direction of the
arrow until it stops.
8
Fasten the TU gear to the TU chassis with the screw.
3
Screw (+P 2.6x5)
Retainer, Pointer
Fig. A
Fig. B
Fig. C
1
Worm, TU
5
Knob, band
4
Plate, blind
2
Pointer
Chassis, TU
TUN LED board
Stopper
Screw (+BV 3x10)
Screws (+BV 3x10)
Screw (+BV 3x10)
Screw (+B 2.6x5)
7
Gear, VR
6
Gear, idler
8
Gear, TU
Main board
Slieder, band
Chassis, TU