6-8
6-4-2. PLL Adjustment
Preparation
Alignment tape ZR5-1/1P rewound in advance.
ZR5-1 : for NTSC
ZR5-1P : for PAL
Procedures
STEP 1
1.
On the menu of maintenance mode, set as follows:
A1: RF ADJUST
A10: A11-A17 ADJUST
2.
Insert alignment tape ZR5-1/1P into this unit.
3.
Press the SET button (or switch S300 on the SS board)
to initiate the adjustment.
4.
If no abnormality is found after all the adjustments are
completed, the “Adjust Complete” message is
displayed on the monitor screen.
5.
Press the MENU button (or switch S301 on the SS
board) to return to the RF ADJUST MODE menu
screen.
STEP 2
1.
Save adjustment data.
2.
On the menu of maintenance mode, set as follows:
A1F: NV-RAM CONTROL
3.
Execute
SAVE ALL ADJUST DATA
.
(2) Insert alignment tape
(3) SET or S300
Adjustment completed
(4) MENU or S301
6-4. Adjustment after EQ-45 board replacement
RF ADJUST MODE
A10:A11-A17 ADJUST
Set alignment tape
and push SET button.
RF ADJUST MODE
A10:A11-A17 ADJUST
A11:PLAY PLL
Adjusting ...
RF ADJUST MODE
A10:A11-A17 ADJUST
Adjust Complete
*A1F:NV-RAM CONTROL
Summary of Contents for DVW-522
Page 6: ......
Page 40: ......
Page 49: ...2 9 2 4 1 Printed Circuit Board Locations Rear view Front view ...
Page 50: ...2 10 Top view of casssette compartment 2 4 1 Printed Circuit Board Locations Top view ...
Page 64: ......
Page 68: ......
Page 82: ......
Page 134: ......
Page 136: ...7 2 7 2 OVERALL 1 4 OVERALL 1 4 7 2 Overall Signal Processing System OVERALL 1 4 DVW 522 522P ...
Page 137: ...7 3 7 3 OVERALL 2 4 OVERALL 2 4 Signal Processing System OVERALL 2 4 DVW 522 522P ...
Page 140: ......