HBD-E2100/E3100/E3200/E4100/E6100
15
2-4. PANEL LOADING ASSY
Note:
Follow the disassembly procedure in the numerical order given.
2-3. CASE
1
four screws (+BV3 (3-CR))
7
case
2
four screws (+BV3 (3-CR))
3
five claws
A
A
5
4
6
1
Insert the clip etc.
tray
BD drive
Insert the clip etc.
processed to the
length of 8 cm or
more in the hole
on the side of the
chassis and push.
8 cm or more
hole
–
Side view
–
–
Top view
–
Note:
Push after it inserts it in this hole well.
3
four claws
4
panel loading assy
2