17
HCD-LF1
3-13. LEVER (LOADING R/L)
lever (loading R)
Align the horizontal position.
lever (loading L)
Install the
both levers so that they move symmetrically.
2
two hooks
4
two hooks
3
lever (loading L)
5
lever (loading R)
spr-T (loading L)
spr-T (loading R)
1
1
PRECAUTION DURING LEVER (LOADING R / L) INSTALLATION